  1. Notice is hereby given that the governing board (“Board”) of the Ross Valley School District (“District” or “Owner”) will receive sealed bids for the following project, Bid No. 2014-02

    Information Technology Infrastructure at Manor, Brookside, Hidden Valley and Wade Thomas Elementary Schools (Elementary Infrastructure Technology Upgrades)

  2. Sealed Bids will be received until 2:00 p.m., May 0, 2014, at the District Office, located at 110 Shaw Drive, San Anselmo, California, at or after which time the bids will be opened and publicly read aloud. Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder.
  3. The Project consists of:

    Install conduit and raceway to provide pathway for copper and fiber communications cable. Install equipment racks in IDF/MDF locations. Install power for classroom raceway and IDF/MDF locations. Install and terminate copper and fiber communications cable.

  4. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders.
  5. To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor Licenses:

    B - General Building Contractor
    C-10 Electrical Contractor

    The Bidder's license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract.

  6. As security for its Bid, each bidder shall provide with its Bid form
    a. a bid bond issued by an admitted surety insurer on the form provided by the District,
    b. cash, or
    c. a cashier's check or a certified check, drawn to the order of the Ross Valley School District,
    in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid.

  7. The successful Bidder shall be required to furnish a 100 % Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project.
  8. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code.
  9. The successful Bidder and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are available from the District or on the Internet at: <http://www.dir.ca.gov>.
  10. The District and/or the California Department of Industrial Relations will be operating a labor compliance program on this Project pursuant to Labor Code section 1771, et seq.
  11. A mandatory pre-bid conference and site visit will be held on May 7, 2014, at 2:00 p.m. at 110 Shaw Drive, San Anselmo, California 94960. To accommodate scheduling problems an additional site-walk will be offered May 14, at 2:00 p.m. All participants are required to sign in at the Administration Building. The site visit is expected to take approximately 4 hours. Failure to attend one of the offered pre-bid conference and site visit meetings or tardiness will render bid ineligible.
  12. The District’s Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.
  13. Contract Documents are available on April 29, 2014, for review at the District Office. Prospective bidders must obtain a copy of the District’s complete set of Bid Documents by contacting Sean Maher at This email address is being protected from spambots. You need JavaScript enabled to view it. or by written request to: RVSD, Attn: Sean Maher, 110 Shaw Drive, San Anselmo, CA 94960
  14. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on: The base bid amount only.

 

END OF DOCUMENT

 

 

Common Core

commoncorelogoLearn about Common Core Standards and their integration into the Ross Valley classroom.

Read more...

Construction Updates

constructionlogoWe're updating all our facilities to meet 21st Century learning needs.

Read More...

District and School Calendars

districtcalendarlogoGoogle calendar of important school events, vacations and more.

Read More...

Go to top